Objection: Sedibelo Platinum Mine Water Use Licence

Written by  Monday, 03 October 2016 17:00
Rate this item
(0 votes)

The Federation for a Sustainable Environment has objected to the Water Use Licence granted to Sedibelo Platinum Mine within the Moses Kotane Local Municipality, North West Province. 

An extract from the objection follows, and the full document is available to download. 

The Pilanesberg Platinum Mine (consolidated with the Sedibelo Platinum Mine) has commenced operations and diverted river systems without an authorised water use licences since 2009 to the 10th of October 2013, without a lawful water use licence.

The principles of the Water Services Act and the National Water Act were designed for equitable access to water, intergenerational equity, and to achieve the following: 

[...] redress the inequalities of racial and gender discrimination of the past; link water management to economic development and poverty eradication; and ensure the preservation of the ecological resource base for future generations.

The additional ground- and surface water impacts of the Project on the Lower Crocodile sub area may result in additional water security risks for the WMA.  The cumulative impacts in this regard have not been assessed.

The impacts of mines are cumulative and typically require several decades to take effect.  By the time environmental and socio-economic consequences become noticeable, the mines have typically closed or become insolvent and thus cannot be compelled anymore to contribute to remediation, either financially or through other actions.  These impacts are externalized to future generations, the environment and affected communities. 

In terms of the Terrestrial, Aquatic Biodiversity and Riparian Assessment Report of the Amendment of the Pilanesberg Platinum Mine’s EMP Closure Objectives, the re-diversion of the Wilgespruit and flooding of the Tuschenkomst Open Pit will have high impacts namely:

  • Loss of change in structure of riparian vegetation;
  • Loss of change in biogeochemical processes;
  • Loss of available habitat for faunal species and the resultant loss of species;
  • Loss of Conservation Important Species; and
  • Loss of available habitat for aquatic species.
  • Reduced functionality of the Heritage Park Corridor.  The proposed Heritage Park corridor narrows to approximately 1 km in width between Ngweding and the proposed flooded pit.  This 1 km stretch will include the rehabilitated waste rock dump, with less than 200m of natural vegetation remaining in the corridor.  The Open Pit, together with the rehabilitated Waste Rock dump, may result in a bottleneck within the Heritage park corridor for dangerous game.
  • The future mining activities of Sedibelo and Magazynksraal* will further limit the corridor width for non-dangerous game; and
  • Net loss of diversity.

 

MINING

Down in the dumps, there's hope

"WHERE there's waste, there's opportunity," said mining hydrologist Kym Morton, pointing to a huddle of shacks perched on top of a mine dump in Krugersdorp.

Fokus reports on Coal Mine east of Springs

SABC's Fokus of 23 July 2017 addresses the planned Palmietkuilen coal mine east ...

Zuma-linked mine dealt legal blow

In arguing against Atha-Africa and its BEE partner being given a mining right in...

SA NEWS

Addressing waste and pollution of the past

The Federation for a Sustainable Environment is proud to announce the launch of the booklet titled “Rehabilitation of Mine Contaminated Eco-Systems. A Contribution to a Just Transition to a Low Carbon Economy to Combat Unemployment and Climate Change” by Mariette Liefferink of the Federation for a Sustainable Environment (FSE). The booklet was commissioned by the Alternative Information and Development Centre (AIDC) in collaboration with the Friedrick Ebert Stiftung.

Nuwe myn ‘sal duisende hul huise kos’

Byna 10 000 mense sal verskuif moet word as Anglo Operations Ltd en Canyon Coal hul sin kry om ’n massiewe oopgroefsteenkoolmyn oos van Springs te begin.

SA coal mines leave legacy of ruin

Johannesburg - A 19-month data investigation of mine closures indicates that since at least 2011 no large coal mines operating in South Africa have been granted closure.

Besoedelingklagte: Mynbase daag nie by hof op

Drie direkteure van die Blyvooruitzicht- en Village Main Reef-goudmyn buite ­Carletonville kan ’n boete van tot R10 miljoen of tien jaar tronkstraf opgelê word weens die beweerde besoedeling en agteruitgang van die omgewing.

WATER

Project to heal polluted river . System will·create stream·of jobs

THE POTENTIAL to create 100 climate jobs and to help : bring a "dead river system" back to life -that's the ration­ale behind a proposed pilot project to heal one of Gau­teng's most heavily polluted river systems, the Tweelopiespruit, which has been con­taminated by more than a century of mining.

'Mine Water can be treated, safe'

SOUTH Africans have to "change their mindsets" that they can't drink acid mine d...

Agencies set up to manage water use flounder

NEARLY 20 years after they were written into South Africa's National Water Act, ...